Open

Coming up

Don't miss

Replay


LATEST SHOWS

THE INTERVIEW

Gilles Kepel, Islamic and Arab world specialist

Read more

BUSINESS DAILY

Argentina braced for another debt default

Read more

DEBATE

Too Late for Sanctions? Pressure Mounts on Russia over Ukraine (part 2)

Read more

DEBATE

Too Late for Sanctions? Pressure Mounts on Russia over Ukraine

Read more

MEDIAWATCH

'What would you do?'

Read more

AFRICA NEWS

Ebola virus: Liberia shuts most border points

Read more

IN THE PAPERS

Netanyahu says Gaza operation will not end quickly

Read more

FOCUS

As France’s Carrefour pulls out, what next for India’s retail market?

Read more

#TECH 24

Internet of Things

Read more

  • Israeli strikes target symbols of Hamas power

    Read more

  • US says Russia violated arms treaty by testing cruise missile

    Read more

  • Argentina in last-ditch effort to avert default

    Read more

  • Karzai’s cousin killed in Afghan suicide attack

    Read more

  • Libya oil tanker fire blazes out of control

    Read more

  • In pictures: From Gaza to Mosul, bittersweet end of Ramadan for Muslims

    Read more

  • France offers asylum to Iraqi Christians

    Read more

  • Moroccan police arrest French al-Qaeda recruiter

    Read more

  • Israel warns of ‘prolonged’ campaign in Gaza

    Read more

  • French mayor files complaint against US father who risked kids’ lives on Mont Blanc

    Read more

  • French footballer Griezmann headed to Atletico Madrid

    Read more

  • Luc Besson’s sci-fi thriller ‘Lucy’ tops US box office

    Read more

  • Video: Slaviansk mourns mass grave victims

    Read more

  • France honours those lost on Air Algérie Flight AH5017

    Read more

  • Video: Ethiopia turns to wine to boost image, economy

    Read more

Business

Boeing's Dreamliner test flight delayed yet again

Video by Carla WESTERHEIDE

Text by NEWS WIRES

Latest update : 2009-06-24

US aerospace giant Boeing has delayed by "several weeks" the first test flight and delivery of its cutting-edge 787 Dreamliner, in the fifth such postponement since 2007.

AFP - Boeing said Tuesday it would delay the first flight and delivery of its new 787 Dreamliner aircraft, the latest postponement in a program seen as a key to the aerospace giant's future.
  
Boeing said a new schedule for the first flight and delivery would be available in "several weeks" and that in the interim the 787 team will continue with other aspects of testing.
  
Boeing said in a statement the delay was "due to a need to reinforce an area within the side-of-body section of the aircraft."
  
It added that the need "was identified during the recent regularly scheduled tests on the full-scale static test airplane."
  
Scott Carson, president and chief executive of Boeing Commercial Airplanes, said the postponement was the correct decision.
  
"Consideration was given to a temporary solution that would allow us to fly as scheduled, but we ultimately concluded that the right thing was to develop, design, test and incorporate a permanent modification to the localized area requiring reinforcement," Carson said.
  
"Structural modifications like these are not uncommon in the development of new airplanes, and this is not an issue related to our choice of materials or the assembly and installation work of our team."
  
Boeing had planned for the much-delayed Dreamliner to have its maiden flight by June 30 on a schedule that puts delivery of the plane to first customer, All Nippon Airways (ANA), in the first quarter of 2010.
  
The Boeing statement said a preliminary analysis indicated that flight test could proceed this month as planned, and last week Boeing officials said the maiden flight was on schedule.
  
"However, after further testing and consideration of possible modified flight test plans, the decision was made late last week that first flight should instead be postponed until productive flight testing could occur," the company said.
  
The company set a news conference for 1400 GMT to announce details of the latest delay.
  
This marked the fifth delay for the Dreamliner, already nearly two years behind the initial schedule.
  
Boeing says it has 865 orders from 56 airlines for the cutting-edge plane, claiming it is the "fastest-selling all-new jetliner in aviation history."
  
The 787 Dreamliner is the company's first new model in more than a decade and features 50 percent plastic composites, compared with 12 percent on its 777s, helping lower fuel consumption.
  
According to Boeing, the 787 will use 20 percent less fuel than similarly sized airplanes, reducing emissions by a similar amount.
  
Plagued by problems from a complex international production system and a two-month machinists strike last year, the Dreamliner's delays have irked customers and resulted in order cancellations.

Date created : 2009-06-23

COMMENT(S)